How far along are the bike routes council was asked to stop?

· Discussed by 3 people · 2 claims

Going ahead

Contracts, purchase records and the tender calendar can show which routes were already committed and whether they could still have been tendered for 2026.

The signed design contracts and the 2026 tender calendar answer both.

People arguing in both directions raised this question, and every claim they made about it is checked, whichever way it points.

What the outcomes mean

Where it came from

Taken from Yegscoop post on council's 2026-08-26 bike lane decision, read end to end. Every factual claim in it was extracted and merged, so this question is listed whatever became of it.

Facebook post · captured · 621 comments

The names below are pseudonyms, one to a commenter within this source; the number is the comment's place in the captured thread.

The original post

The claims under it

  1. The City has already paid for the design and signed contracts for the planned routes.

    Discussed by 2 people

    • We've already paid for the design, and many contracts

      Cedar Pelican C. · comment 183

    • designs were already paid for right

      Windy Porcupine C. · comment 210

  2. The routes being pushed through are too late to tender for the 2026 construction season anyway.

    Discussed by 1 person

    • The routes in question are too late to tender for 2026 anyway!

      Boreal Marmot L. · comment 200