Skip to content
On this page

The Holyrood school bike lane design was approved and was stopped after the school principal objected.

· Said in 1 comment

No finding yet

This claim has not been checked. It is waiting on the question below, which is what a brief, a body of evidence and a panel run are spent on.

Its questionGoing ahead

The design file, approval history and correspondence can show what was proposed outside the school, the councillor’s official role and why the design stopped.

Raised in extraction by haiku, luna

What the states mean

The question it is checked under

What was planned for the bike lane outside the Holyrood school, and what stopped it?

Going ahead. One brief covers every claim under that question, and each claim still gets its own finding. The question's page carries the reason, the grouping and the other claims made about it.

Where it came from

Taken from Yegscoop post on council's 2026-08-26 bike lane decision, read end to end. Every factual claim in it was extracted and merged, so this one is listed whatever became of it.

Facebook post · captured · 621 comments

The original post

How it was said

Every wording of this claim found in the source, quoted exactly. The names are pseudonyms, one to a person within the source.

  • it was approved. It was the principal of the school that caused a commotion and had it stopped.

    Icy Grebe A.