Skip to content
YEGFacts.ca

YF-EV-0028

Centre City Cycle Track Pilot — Final Report (City of Calgary)

https://www.calgary.ca/content/dam/www/transportation/tp/documents/cycling/city-centre-cycle-track/cycle-track-summary-report-nov-2016.pdf

What this source can establish

What Calgary counted on its centre-city cycle-track pilot corridors: four times as many daily winter bicycle trips comparing January 2015 with January 2016, and over 160,000 bicycle trips between November 2015 and the end of March 2016. Establishes corridor counts before and after the tracks opened, not a citywide winter mode share and not a controlled causal estimate of the infrastructure's effect.

Record

Publisher
City of Calgary
Kind
analytical-report
Published
not stated
Retrieved
2026-09-01
Redistribution
unclear
Archive
retained privately; hash published
SHA-256
2d16fedbde081a34d79710419ea5a2ae11aa1c6d7375c9ee82751e0576d2d171

City of Calgary report; redistribution terms not stated. Fails closed to private.

Permitted excerpts

This source cannot be mirrored here, so these are the passages we are permitted to reproduce — the parts a claim on this site actually rests on.

  • “On average, there are four times as many daily winter bicycle trips than before the cycle track was installed when comparing January 2015 (before the cycle) and January 2016 (after the cycle).”
  • “Over 160,000 bicycle trips occurred between November 2015 and the end of March 2016.”

Verify independently

Fetch the original and hash it: if the bytes still match the SHA-256 above, you have the same document we read. If the page has changed since or the link has died, email [email protected] and we will arrange verification against the archived copy. Rights terms stop us republishing this file; they do not stop us proving which file it was.

Used by