YF-EV-0137
2025 Infrastructure Report (City of Edmonton, Integrated Infrastructure Services)
https://www.edmonton.ca/sites/default/files/public-files/IIS-Infrastructure-Report-2025.pdf
What this source can establish
The City's annual infrastructure report for 2025, listing the Active Transportation Network Expansion at a $100 million budget with a target completion in 2027 and describing it as 2 per cent of approximately $5 billion in transportation projects including roads and bridges. Establishes the City's own dated statement of the program's size and share, a stronger record than the project web page that says the same.
Record
- Publisher
- City of Edmonton
- Kind
- analytical-report
- Published
- 2025-12-31
- Retrieved
- 2026-09-02
- Redistribution
- unclear
- Archive
- retained privately; hash published
- SHA-256
- b7fa65bb2bc76511c998a223c59c1714d42a4e665884a39ac676b2166ff843ed
City of Edmonton document; the archived bytes carry no redistribution grant. Fails closed to private.
Verify independently
Fetch the original and hash it: if the bytes still match the SHA-256 above, you have the same document we read. If the page has changed since or the link has died, email [email protected] and we will arrange verification against the archived copy. Rights terms stop us republishing this file; they do not stop us proving which file it was.
