Skip to content

YF-EV-0169

132 Avenue Renewal: What We Heard Report on the Draft Designs, February 2022

https://www.edmonton.ca/sites/default/files/public-files/132AVE_DraftDesigns_WWH_Report.pdf

What this source can establish

The City's 132 Avenue renewal draft design, put to the public in early 2022, proposed one driving lane in each direction with turning lanes near intersections, together with traffic calming. It records what residents said about that draft. It is a draft design, not a record of what was built or of which finished sections replaced a driving lane with an on-street bike lane.

Record

Publisher
City of Edmonton
Kind
analytical-report
Published
not stated
Retrieved
2026-09-24
Redistribution
unclear
Archive
retained privately; hash published
SHA-256
cd3333f6e0ab8ede8d56676c407f0e2af485b71f6f7afa4fb116d541f9626470

City of Edmonton report; the archived bytes carry no redistribution grant. Fails closed to private.

Verify independently

Fetch the original and hash it: if the bytes still match the SHA-256 above, you have the same document we read. If the page has changed since or the link has died, email [email protected] and we will arrange verification against the archived copy. Rights terms stop us republishing this file; they do not stop us proving which file it was.

Used by