YF-EV-0172
132 Avenue Renewal, Phase 5 frequently asked questions (final design), 2022
https://www.edmonton.ca/sites/default/files/public-files/132AveRenewal-Phase5-FAQ.pdf?cb=1770738873
What this source can establish
The City's account of the 132 Avenue final design. The road had at least one lane each way and in some sections two lanes each way; the final design keeps one driving lane in each direction at minimum, with turning lanes near major intersections. It does not isolate which former driving-lane space became bike facility.
Record
- Publisher
- City of Edmonton
- Kind
- analytical-report
- Published
- not stated
- Retrieved
- 2026-09-24
- Redistribution
- unclear
- Archive
- retained privately; hash published
- SHA-256
- a81d079a757f49b35fa2e8e1557a2253e474b4938dfa49b8d9b499d9606a0a98
City of Edmonton report; the archived bytes carry no redistribution grant. Fails closed to private.
Verify independently
Fetch the original and hash it: if the bytes still match the SHA-256 above, you have the same document we read. If the page has changed since or the link has died, email [email protected] and we will arrange verification against the archived copy. Rights terms stop us republishing this file; they do not stop us proving which file it was.
Used by
- Has the City taken driving lanes for bike lanes all over Edmonton? — Bike lanes and Edmonton traffic
