Skip to content

YF-EV-0172

132 Avenue Renewal, Phase 5 frequently asked questions (final design), 2022

https://www.edmonton.ca/sites/default/files/public-files/132AveRenewal-Phase5-FAQ.pdf?cb=1770738873

What this source can establish

The City's account of the 132 Avenue final design. The road had at least one lane each way and in some sections two lanes each way; the final design keeps one driving lane in each direction at minimum, with turning lanes near major intersections. It does not isolate which former driving-lane space became bike facility.

Record

Publisher
City of Edmonton
Kind
analytical-report
Published
not stated
Retrieved
2026-09-24
Redistribution
unclear
Archive
retained privately; hash published
SHA-256
a81d079a757f49b35fa2e8e1557a2253e474b4938dfa49b8d9b499d9606a0a98

City of Edmonton report; the archived bytes carry no redistribution grant. Fails closed to private.

Verify independently

Fetch the original and hash it: if the bytes still match the SHA-256 above, you have the same document we read. If the page has changed since or the link has died, email [email protected] and we will arrange verification against the archived copy. Rights terms stop us republishing this file; they do not stop us proving which file it was.

Used by