Skip to content

YF-EV-0202

Approved 2019-2022 Capital Budget (City of Edmonton)

https://www.edmonton.ca/sites/default/files/public-files/assets/APPROVED_Capital_Budget_2019_2022.pdf

What this source can establish

The Arterial Road Renewal Program section says the assessed arterial network is compared to Council's overall target of fewer than 10 per cent of the arterial roads in D or F condition, and that arterial roads are assessed for surface distress and ride comfort every two years and for structural integrity every five. Elsewhere it says the City has 1,180 kilometres of alleys, two-thirds of them in poor condition, and describes an Alley Renewal Strategy, introduced in 2017, to eliminate alleys rated to be in very poor condition. Establishes that such a target and such an alley estimate were stated in the 2019-2022 budget cycle; it does not establish that the target was in force on 2026-09-03, that it applies to any asset beyond arterial roads, or what condition alleys were in at any later date.

Record

Publisher
City of Edmonton
Kind
policy-document
Published
not stated
Retrieved
2026-09-24
Redistribution
unclear
Archive
retained privately; hash published
SHA-256
624ae537161e838c2ea7959cba80b28e982ebb6fb91fd09c6cf98271ad42cdc4

City of Edmonton document; the archived bytes carry no redistribution grant. Fails closed to private.

Verify independently

Fetch the original and hash it: if the bytes still match the SHA-256 above, you have the same document we read. If the page has changed since or the link has died, email [email protected] and we will arrange verification against the archived copy. Rights terms stop us republishing this file; they do not stop us proving which file it was.

Used by