YF-EV-0241
Active Transportation Network Expansion: route table as published on 2026-10-01
https://www.edmonton.ca/projects_plans/roads/active-transportation-network-improvements-project
What this source can establish
The same City project page as retrieved live on 2026-10-01. The route table carries the same columns; since the 2026-08-31 capture, several routes moved from under construction to open for use, the Holyrood, Idylwylde, Bonnie Doon and Strathearn routes moved from 2026 to 2027 with a note that the Infrastructure Committee discussion of 2026-08-26 confirmed the planned routes proceed, and the 50 Street row split in two. Establishes what the City published about each route's parking change on that date, so a reviewer can report whether any route's classification changed between the two dates; it does not establish stall counts or what was built.
Record
- Publisher
- City of Edmonton
- Kind
- city-webpage
- Published
- not stated
- Retrieved
- 2026-10-02
- Redistribution
- unclear
- Archive
- retained privately; hash published
- SHA-256
- fed38b5e0d64b48a7bbeb4a53421aca4969c9f694e29e3e04f7547b843723b3d
City of Edmonton webpage; the archived bytes carry no redistribution grant. Fails closed to private.
Verify independently
Fetch the original and hash it: if the bytes still match the SHA-256 above, you have the same document we read. If the page has changed since or the link has died, email [email protected] and we will arrange verification against the archived copy. Rights terms stop us republishing this file; they do not stop us proving which file it was.
Used by
No published claim rests on this source yet.
