YF-EV-0242
Route table of the Active Transportation Network Expansion as the Internet Archive held it on 2026-07-07
What this source can establish
The same City project page as captured by the Internet Archive on 2026-07-07 (timestamp 20260707130507), before the 2026-08-26 committee meeting. It carries the Grovenor routes (148 Street, 104 Avenue, 144 Street) as a local street bikeway starting construction in 2026 with the parking removals the City then planned, and the 50 Street route with parking to be removed on both sides from 101A Avenue to 109A Avenue; by 2026-08-31 the Grovenor row read N/A and deferred, with a note that the routes were cancelled over community and Council feedback about the loss of parking, and the 50 Street row read to be confirmed after Council's motion of 2026-07-07. Establishes what the City published on that date, for the routes it later cancelled or redesigned; it does not establish stall counts or what was built.
Record
- Publisher
- City of Edmonton
- Kind
- city-webpage
- Published
- not stated
- Retrieved
- 2026-10-01
- Redistribution
- unclear
- Archive
- retained privately; hash published
- SHA-256
- cc1411d86aba1096bfc28a992271c15005666d473802a0f7c79b92a5709a3517
City of Edmonton webpage via the Internet Archive; the archived bytes carry no redistribution grant. Fails closed to private.
Verify independently
Fetch the original and hash it: if the bytes still match the SHA-256 above, you have the same document we read. If the page has changed since or the link has died, email [email protected] and we will arrange verification against the archived copy. Rights terms stop us republishing this file; they do not stop us proving which file it was.
Used by
No published claim rests on this source yet.
